East Rutherford NJ

Before

Rip out old Sheetrock, prep ceiling frame. Rip out existing flooring & prep for new Pre-finished flooring, prep for new Sheetrock

After

New Pre-finished 3 1/4 x 3/4 Natural Flooring, New Ceiling Fan, Brand New Red Oak Staircase With Colonial Series Newels & 6010 Rail Pre-finished to Natural With Semi-Gloss Finish. Brand New recess Lighting, Anderson Windows with new casing around windows.

Before

Ripped out old Sheetrock, existing windows, and old baseboard heater.

After

New Anderson windows, New baseboard Heater, New Ceiling Fan, New Base-molding, New Crown Molding, New Frame on Ceiling, New Interior Paint, New Sheetrock

Before

Gutted walls completely, check structural frame. Prep For Sheetrock & Recess Lighting. Ripped out existing stair to replace with new.

After

Frame landing for new stair, prep sub-floor for new Pre-finished flooring.

Before

Prep Foyer entrance for new windows, wire new doorbell

After

New doorbell, New molding, New Baseboard Heater, New Anderson Windows, New Door Casing, New Recess Lighting

Before

Ripped Out Existing Stair & Replaced With All Oak Staircase & Hand Rail Pre-finished To Natural With Semi-Gloss Finish

After

Hillsborugh NJ

Before

Remove carpet at stair prep for retro tread’s & new railing’s

After

New Maple retro treads, New Maple Box Newel’s, New Maple Railing’s, New Iron Baluster’s

Before

Rip out existing carpet prep for new 3 1/4 x 3/4 Maple Pre-finished Flooring

After

New Pre-finished Maple Flooring, New Base Molding

Before

After

Before

Rip out carpet existing railing’s

After

Completely finished – New Maple Treads, New Maple Railing’s & Newel’s with Iron Balusters

Before

After

Monroe NJ

Before

Balcony Level Rail

After

New 3011 Bunker Hill series newel with 6910 rail and single basket & double twist iron balusters.

Before

New stair replacement. Remove existing stair & haul away.

After

Install new red oak treads with poplar risers and stringers. Prefinish new treads to red mahogany with semi-gloss finish. Paint new risers and stringers to white semi-gloss by benjamin moore.

Before

Remove all existing railings

After

Install new pre-finished railings over the post. Bunker Hill series newels with 6910 rail & Single basket series iron balusters.